国产麻豆天美果冻无码视频,天美传媒AV成人片免费看,天美麻花星空高清mv,星空无限传媒官网免费,星空无限传媒免费观看电视剧,麻花天美星空MV免费观看完整版,天美传媒妇乱XXXXX视频,天美麻花星空高清免费观看完整版影视,星空无痕MV免费观看麻花影视,天美传奇星空MV高清免费,麻花星空无限传媒有限公司官网

網(wǎng)站公告-NOTICE

新聞資訊

當(dāng)前位置:首頁 / 新聞資訊

濟(jì)南電纜橋架安裝施工要求及規(guī)范

  電纜橋架在我國(guó)的應(yīng)用只有十多年,在歐美發(fā)達(dá)也不過是幾十年。在一個(gè)機(jī)房項(xiàng)目中,比起造價(jià)昂貴、高科技的硬件和軟件,橋架顯的很不起眼,也很少為人關(guān)注,但它卻也是整個(gè)布線工程中不可缺少的部分。那么在施工中電纜橋架安裝施工要求及規(guī)范怎么樣?

  The application of cable trays in China has only been more than ten years, and in developed countries in Europe and America, it is only a few decades. In a computer room project, compared to expensive and high-tech hardware and software, cable trays may appear inconspicuous and receive little attention, but they are still an indispensable part of the entire cabling project. So what are the requirements and standards for the installation of cable trays during construction?base64_image

  1 一般規(guī)定  1.1本章適用于電壓為10KV及以下新建擴(kuò)建的一般工業(yè)與民用建筑電纜、橋架安裝和橋架內(nèi)電纜敷設(shè)

  1 General Provisions 1.1 This chapter applies to the installation of cables, cable trays, and cable laying inside cable trays for newly constructed and expanded general industrial and civil buildings with a voltage of 10KV or below

  1.2電纜橋架安裝和橋架內(nèi)電纜敷設(shè),應(yīng)按已批準(zhǔn)的設(shè)計(jì)文件施工。

  1.2 The installation of cable trays and the laying of cables inside the trays shall be carried out in accordance with the approved design documents.

  1.3由支、吊、托架支撐的托盤(槽)或梯架直線段、彎通非直線段組合而成,敷設(shè)電纜具有連續(xù)性的剛性結(jié)構(gòu)系統(tǒng),為電纜橋架。見圖1.3

  1.3 A rigid structural system consisting of trays (troughs) or ladder straight sections and curved non straight sections supported by supports, hangers, and brackets, with continuous cable laying, is called a cable tray. Refer to Figure 1.3

  1.4 金屬電纜橋架及其支架和引入或引出的金屬電纜導(dǎo)管必須接地(PE)或接零(PEN)可靠,且必須符合下列規(guī)定:

  1.4 Metal cable trays and their supports, as well as metal cable conduits introduced or led out, must be reliably grounded (PE) or grounded (PEN), and must comply with the following regulations:

  1.4.1金屬電纜橋架及支架全長(zhǎng)應(yīng)不少于2處與接地(PE)或接零(PEN)干線相連接;

  1.4.1 The total length of metal cable trays and supports should be connected to the grounding (PE) or neutral (PEN) main line at no less than 2 points;

  1.4.2非鍍鋅電纜橋架間連接板的兩端跨接線銅芯接地線,接地線小允許截面積不小于4mm2;

  1.4.2 Copper core grounding wire for the two ends of the connecting plate between non galvanized cable trays, with a minimum allowable cross-sectional area of not less than 4mm2 for the grounding wire;

  1.4.3鍍鋅電纜橋架間連接板的兩端不跨接接地線,但連接板兩端不少于2個(gè)有防松螺帽或防松墊圈的連接固定螺栓。

  1.4.3 The two ends of the connecting plate between galvanized cable trays shall not be connected to the grounding wire, but there shall be no less than 2 connection fixing bolts with anti loosening nuts or anti loosening washers at both ends of the connecting plate.

  1.4.5電纜敷設(shè)嚴(yán)禁有絞擰、鎧裝壓扁、護(hù)層斷裂和表面嚴(yán)重劃傷等缺陷。

  1.4.5 Cable laying must strictly prohibit defects such as twisting, flattening of armor, breakage of protective layer, and severe surface scratches.

  1.4.6電纜橋架處如有防火要求的場(chǎng)所,應(yīng)采取防火隔離措施。

  If there are fire prevention requirements at the cable tray location, fire isolation measures should be taken.

  2 施工準(zhǔn)備

  2. Construction preparation

  2.1 技術(shù)準(zhǔn)備:

  2.1 Technical Preparation:

  2.1.1按照已批準(zhǔn)的施工組織設(shè)計(jì)(施工方案)進(jìn)行技術(shù)、交底。

  2.1.1 Conduct technical and safety briefings in accordance with the approved construction organization design (construction plan).

  2.1.2 施工執(zhí)行工藝標(biāo)準(zhǔn)、圖集、規(guī)范齊全。

  2.1.2 The construction execution process standards, drawings, and specifications are complete.

  2.1.3電纜橋架敷設(shè)前,應(yīng)檢查橋架敷設(shè)有無與其他設(shè)備、管線交叉或重疊無法施工的地方,施工前應(yīng)與各工種、監(jiān)理或建設(shè)單位及設(shè)計(jì)單位協(xié)商好,并作好記錄,以保證施工順利進(jìn)行。

  Before laying cable trays, it is necessary to check whether there are any areas where the tray crosses or overlaps with other equipment or pipelines that cannot be constructed. Prior to construction, it is necessary to consult with various trades, supervisors, construction units, and design units, and make records to ensure smooth construction.

  2.1.4根據(jù)施工圖或施工所用電纜應(yīng)作好電纜牽引力的計(jì)算。

  2.1.4 According to the construction drawings or the cables used for construction, the calculation of cable traction force should be carried out.

  1.電纜橋架規(guī)格及型號(hào)必須符合設(shè)計(jì)要求,附件齊全;橋架與配件、附件和緊固件各種型鋼均應(yīng)采用鍍鋅標(biāo)準(zhǔn)件。

  1. The specifications and models of cable trays must meet the design requirements, and all accessories must be complete; All types of steel for cable trays, accessories, attachments, and fasteners should use galvanized standard parts.

  2.各種規(guī)格電纜橋架的直線段、彎通、橋架附件及支、吊架立柱及型鋼等有產(chǎn)品合格證,橋架內(nèi)外應(yīng)光滑平整,無棱刺,不應(yīng)有扭曲翹邊等變形現(xiàn)象。

  2. The straight sections, bends, accessories, supports, hangers, columns, and steel sections of various specifications of cable trays should have product certification. The inside and outside of the tray should be smooth and flat, without edges or burrs, and there should be no distortion or warping.

  3.橋架訂貨或制作應(yīng)按設(shè)計(jì)要求進(jìn)行,不應(yīng)有誤,應(yīng)反復(fù)校核以免造成浪費(fèi)。

  3. The ordering or production of cable trays should be carried out according to the design requirements, without errors, and should be repeatedly checked to avoid waste.

  4.橋架安裝選擇需屏蔽電氣干擾的電纜回路,有腐蝕的場(chǎng)所、易燃粉塵場(chǎng)所,應(yīng)選用無蓋無孔封閉型托盤,當(dāng)需要因地制宜的場(chǎng)所,宜選用組裝式托盤或有孔托盤及梯架;在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所,宜帶有蓋板。低壓電力電纜與控制電纜共用同一托盤或梯架時(shí),應(yīng)選用中間有隔板的托盤或梯架;在托盤、梯架分支、引上、引下處應(yīng)設(shè)適當(dāng)?shù)膹澩?;因受空間條件限制不便裝設(shè)彎通或有特殊要求時(shí),可選用軟連接板,鉸接板;伸縮縫應(yīng)設(shè)置伸縮板;連接兩段不同寬度或高度的托盤、梯架可配置變寬或變高板。但在施工中,支、吊架和橋架的選擇應(yīng)依設(shè)計(jì)或工程布置條件選擇。

  4. When installing cable trays, cable circuits that need to be shielded from electrical interference should be selected. In places with corrosion and flammable dust, uncovered and non perforated enclosed trays should be used. When suitable for local conditions, assembled trays or perforated trays and ladders should be selected; In environments or outdoor places that are prone to dust accumulation and require cover, it is advisable to have a cover plate. When low-voltage power cables and control cables share the same tray or ladder, a tray or ladder with a partition in the middle should be selected; Appropriate bends should be installed at the branching, leading up, and leading down points of pallets and ladders; When it is not convenient to install bends due to space constraints or there are special requirements, soft connecting plates and hinged plates can be used; Expansion joints should be equipped with expansion plates; Connecting two trays or ladders of different widths or heights can be configured with variable width or height boards. However, during construction, the selection of supports, hangers, and cable trays should be based on the design or engineering layout conditions.

  5.托盤、梯架的寬和高度,應(yīng)按下列要求選擇:

  5. The width and height of pallets and ladders should be selected according to the following requirements:

  (1)電纜在橋架內(nèi)的填充率,電力電纜不應(yīng)大于40%;控制電纜不應(yīng)大于50%。并應(yīng)留有一定的備用空位,以便今后為增添電纜用;

  (1) The filling rate of cables in cable trays should not exceed 40% for power cables; The control cable should not exceed 50%. And there should be some spare space left for future cable additions;

  (2)所選托盤、橋架規(guī)格的承載能力應(yīng)滿足規(guī)定。其工作均布荷載不應(yīng)大于所選托盤、梯架荷載等級(jí)的額定均布荷載;

  (2) The bearing capacity of the selected tray and bridge specifications should meet the requirements. The uniformly distributed load of its work should not exceed the rated uniformly distributed load of the selected pallet and ladder load level;

  (3)工作均布荷載下的相對(duì)撓度不宜大于1/200。

  (3) The relative deflection under uniformly distributed load should not exceed 1/200.

  托盤、梯架直線段,可按單件標(biāo)準(zhǔn)長(zhǎng)度選擇。單件標(biāo)準(zhǔn)長(zhǎng)度一般規(guī)定為2、3、4、6m。托盤、梯架的寬度與高度常用規(guī)格尺寸系列如表2.4-1

  Tray and ladder straight sections can be selected according to the standard length of a single piece. The standard length of a single piece is generally specified as 2, 3, 4, and 6 meters. The commonly used specifications and dimension series for the width and height of pallets and ladders are shown in Table 2.4-1

  注:符號(hào)△表示常用規(guī)格。

  Note: The symbol △ represents commonly used specifications.

  各類彎通及附件規(guī)格,應(yīng)適合工程布置條件,并與托盤、梯架配套。

  All types of bends and accessory specifications should be suitable for the engineering layout conditions and matched with pallets and ladders.

  支、吊架規(guī)格選擇,應(yīng)按托盤、梯架規(guī)格層數(shù)、跨距等條件配置,并應(yīng)滿足荷載的要求。

  The selection of support and hanger specifications should be based on the number of layers, span, and other conditions of the pallet and ladder, and should meet the requirements of the load.

  鋼制橋架的表面處理方式,應(yīng)按工程環(huán)境條件、重要性、耐久性和技術(shù)經(jīng)濟(jì)性等因素進(jìn)行選擇。一般情況宜按表2.4-2選擇適用工程環(huán)境條件的防腐處理方式。當(dāng)采用表中“T”類防腐方式為鍍鋅鎳合金、高純化等其它防腐處理的橋架,應(yīng)按規(guī)定試驗(yàn)驗(yàn)證,并應(yīng)具有明確的技術(shù)質(zhì)量指標(biāo)及檢測(cè)方式。

  The surface treatment method for steel cable trays should be selected based on factors such as engineering environmental conditions, importance, durability, and technical economy. Generally, it is advisable to choose the anti-corrosion treatment method that is suitable for the engineering environmental conditions according to Table 2.4-2. When using the "T" anti-corrosion method in the table, such as galvanized nickel alloy, high-purity or other anti-corrosion treatments, the bridge should be tested and verified according to regulations, and should have clear technical quality indicators and testing methods.

  注:符號(hào)“○”表示防腐類別。

  Note: The symbol "○" indicates the recommended anti-corrosion category.

  6.橋架的外觀檢查

  6. Appearance inspection of bridge frame

  橋架產(chǎn)品包裝箱內(nèi)應(yīng)有裝箱清單、產(chǎn)品合格證及出廠檢驗(yàn)報(bào)告。托盤、梯架板材厚度應(yīng)滿足表2.6的規(guī)定。表面防腐層材料應(yīng)符合現(xiàn)行有關(guān)標(biāo)準(zhǔn)的規(guī)定。

  The packaging box for bridge products should include a packing list, product certification, and factory inspection report. The thickness of pallets and ladder boards should meet the requirements of Table 2.6. The surface anti-corrosion coating material should comply with the relevant national standards currently in effect.

  熱浸鍍鋅的托盤、橋架鍍層表面應(yīng)均勻,無毛刺、過燒、掛灰、傷痕、局部未鍍鋅(直徑2mm以上)等缺陷,不得有影響安裝的鋅瘤。螺紋的鍍層應(yīng)光滑,螺栓連接件應(yīng)能擰入。

  The surface of hot-dip galvanized trays and cable trays should be uniform, without defects such as burrs, overburning, hanging dust, scars, and partial non galvanizing (diameter of 2mm or more), and there should be no zinc nodules that affect installation. The coating of the thread should be smooth, and the bolt connection should be able to be screwed in.

  電鍍鋅的鋅層表面應(yīng)光滑均勻,致密。不得有起皮、氣泡、花斑、局部未鍍、劃傷等缺陷。

  The surface of the zinc layer of electroplated zinc should be smooth, uniform, and dense. There shall be no defects such as peeling, bubbles, flower spots, partial uncoated areas, scratches, etc.

  噴涂應(yīng)平整、光滑、均勻、不起皮、無氣泡水泡。

  The spraying should be smooth, even, without peeling or bubbles.

  橋架焊縫表面均勻,不得有漏焊、裂紋、夾渣、燒穿、弧坑等缺陷。

  The surface of the bridge welding seam should be uniform and free of defects such as missed welding, cracks, slag inclusion, burn through, arc craters, etc.

  橋架螺栓孔徑,在螺桿直徑不大于M16時(shí),可比螺桿直徑大2mm。

  The hole diameter of the bridge bolt can be 2mm larger than the screw diameter when the screw diameter is not greater than M16.

  螺栓連接孔的孔距允許偏差:同一組內(nèi)相鄰兩孔間距±0.7mm,同一組內(nèi)任意兩孔間距±1mm;相鄰兩組的端孔間距±1.2mm。

  The allowable deviation for the distance between bolt connection holes is: the distance between adjacent holes in the same group is ± 0.7mm, the distance between any two holes in the same group is ± 1mm, and the distance between end holes in adjacent groups is ± 1.2mm.

  7.膨脹螺栓:應(yīng)根據(jù)允許拉力和剪力進(jìn)行選擇;可按計(jì)劃驗(yàn)收,絲扣應(yīng)完好無損。

  7. Expansion bolts: should be selected based on allowable tensile and shear forces; The inspection can be carried out according to the plan, and the thread should be intact and undamaged.

  8.電纜應(yīng)有合格證和“CCC”認(rèn)證標(biāo)志,并應(yīng)有“CCC”認(rèn)證復(fù)印件;每盤電纜上應(yīng)標(biāo)明規(guī)格、型號(hào)、電壓等級(jí)、長(zhǎng)度及出廠日期電纜相應(yīng)完好無損。

  8. The cable should have a certificate of conformity and the "CCC" certification mark, and should have a copy of the "CCC" certification; Each cable reel should indicate the specifications, model, voltage level, length, and date of manufacture, and the cable should be intact and undamaged accordingly.

  9.電纜外觀完好無損,鎧裝無銹蝕、無機(jī)械操作,無皺折和扭曲現(xiàn)象。油浸電纜應(yīng)密封良好,無漏油及滲油現(xiàn)象。橡套及塑料電纜外皮及絕緣層無老化及裂紋。電纜端頭密封良好。

  9. The appearance of the cable is intact and undamaged, the armor is not corroded, there is no mechanical operation, and there is no wrinkling or twisting phenomenon. Oil immersed cables should be well sealed without oil leakage or seepage. The rubber sleeve and plastic cable sheath and insulation layer have no aging or cracks. The cable end is well sealed.

  10.其它附屬材料;電纜標(biāo)示牌、油漆、汽油、封鉛、硬脂酸白布帶、橡皮包布、黑包布、塑料絕緣帶等均應(yīng)符合要求

  10. Other ancillary materials; Cable signs, paint, gasoline, lead sealing, stearic acid white cloth tape, rubber wrap, black wrap, plastic insulation tape, etc. should all meet the requirements

  3 施工工藝

  3 Construction Techniques

  3.1 電纜橋架安裝施工工藝

  3.1 Construction process for cable tray installation

  3.1.1電纜橋架安裝工藝流程:

  3.1.1 Cable tray installation process:

  定位放線→預(yù)埋鐵件或膨脹螺栓→支、吊、托架安裝→橋架安裝→保護(hù)接地安裝

  Positioning and laying out → Pre embedded iron parts or expansion bolts → Installation of supports, hangers, and brackets → Installation of cable trays → Installation of protective grounding

  3.1.2根據(jù)施工圖確定始端到終端位置,沿圖紙標(biāo)定走向,找好水平、垂直、彎通,用粉線袋或畫線沿橋架走向在墻壁、頂棚、地面、梁、板、柱等處彈線或畫線,并均勻檔距畫出支、吊、托架位置。

  3.1.2 Determine the starting and ending positions according to the construction drawing, mark the direction along the drawing, find the horizontal, vertical, and curved lines, use a powder line bag or draw lines along the bridge direction to snap or draw lines on walls, ceilings, floors, beams, slabs, columns, etc., and draw the positions of supports, hangers, and brackets evenly spaced.

  3.1.3預(yù)埋鐵件或膨脹螺栓

  3.1.3 Pre embedded iron parts or expansion bolts

  (1) 預(yù)埋鐵件的自制加工不應(yīng)小于120mm×80mm×6mm,做法如本標(biāo)準(zhǔn)6.3.7.2圖6.3.7.2。其錨固圓鋼的直徑不小于10mm。

  (1) The self-made processing of embedded iron parts should not be less than 120mm × 80mm × 6mm, as shown in Figure 6.3.7.2 of this standard. The diameter of the anchored round steel shall not be less than 10mm.

  (2) 緊密配合土建結(jié)構(gòu)的施工,將預(yù)埋鐵件平面緊貼模板,將錨固圓鋼用綁扎或焊接的方法固定在結(jié)構(gòu)內(nèi)的鋼筋上;待混凝土模板拆除后,預(yù)埋鐵件平面外露,將支架、吊架或托架焊接在上面進(jìn)行固定。

  (2) Closely cooperate with the construction of civil engineering structures, tightly adhere the embedded iron parts to the formwork, and fix the anchoring round steel to the steel bars inside the structure by binding or welding; After the concrete formwork is removed, the embedded iron parts should be exposed on the surface, and the brackets, hangers or brackets should be welded on top for fixation.

  (3) 根據(jù)支架承受的荷重,選擇相應(yīng)的膨脹螺栓及鉆頭;埋好螺栓后,可用螺母配上相應(yīng)的墊圈將支架或吊架直接固定在金屬膨脹螺栓上,可參見本標(biāo)準(zhǔn)6.3.7.7圖表。

  (3) Select the corresponding expansion bolts and drill bits based on the load borne by the bracket; After burying the bolts, the bracket or hanger can be directly fixed to the metal expansion bolt with nuts and corresponding washers, as shown in Figure 6.3.7.7 of this standard.

  4.支、吊架安裝

  4. Installation of supports and hangers

  (1) 支架與吊架所用鋼材應(yīng)平直,無顯著扭曲。下料后長(zhǎng)短偏差應(yīng)在3mm范圍內(nèi),切口處應(yīng)無卷邊、毛刺;

  (1) The steel used for brackets and hangers should be straight and free from significant distortion. The length deviation after cutting should be within 3mm, and there should be no curled edges or burrs at the incision;

  (2) 鋼支架與吊架應(yīng)焊接牢固,無顯著變形,焊接前厚度超過4mm的支架、鐵件應(yīng)打坡口,焊縫均勻平整,焊縫長(zhǎng)度應(yīng)符合要求,不得出現(xiàn)裂紋、咬邊、氣孔、凹陷、漏焊等缺陷;

  (2) Steel brackets and hangers should be welded firmly without significant deformation. Brackets and iron parts with a thickness exceeding 4mm before welding should be chamfered, and the weld seam should be uniform and smooth. The weld seam length should meet the requirements and should not have defects such as cracks, undercutting, porosity, indentation, or missed welding;

  (3)支架與吊架應(yīng)安裝牢固,保證橫平豎直,在有坡度的建筑物上安裝支架與吊架應(yīng)與建筑物的坡度、角度一致;

  (3) The brackets and hangers should be installed firmly, ensuring horizontal and vertical alignment. When installing brackets and hangers on buildings with slopes, they should be consistent with the slope and angle of the building;

  支架與吊架的規(guī)格一般不應(yīng)小于扁鋼30mm×3mm;角鋼25mm×25mm×3mm;

  The specifications of brackets and hangers should generally not be less than 30mm × 3mm for flat steel and 25mm × 25mm × 3mm for angle steel;

 ?。?)嚴(yán)禁用電氣焊切割鋼結(jié)構(gòu)或輕鋼龍骨任何部位;

  (5) It is strictly prohibited to use electrical welding to cut any part of steel structures or light steel joists;

 ?。?)吊具應(yīng)采用定型產(chǎn)品,并應(yīng)有各自獨(dú)立的吊裝卡具或支撐系統(tǒng)。

  (6) Universal lifting devices should use standardized products and have their own independent lifting fixtures or support systems.

 ?。?)固定支點(diǎn)間距一般不應(yīng)大于1.5~2m。在進(jìn)出接線盒、箱、柜、轉(zhuǎn)角、轉(zhuǎn)彎和變形縫兩端及丁字接頭的三端500mm以內(nèi)應(yīng)設(shè)固定支持點(diǎn)。

  (7) The distance between fixed support points should generally not exceed 1.5-2m. Fixed support points should be set within 500mm at both ends of the entrance and exit junction boxes, boxes, cabinets, corners, bends, and deformation joints, as well as at the three ends of the T-shaped joint.

  (8)嚴(yán)禁用木磚固定支架與吊架。

  (8) It is strictly prohibited to use wooden bricks to fix brackets and hangers.

  5.橋架安裝

  5. Bridge installation

  (1) 電纜橋架水平敷設(shè)時(shí),支撐跨距一般為1.5~3m,電纜橋架垂直敷設(shè)時(shí)固定點(diǎn)間距不宜大于2m。橋架彎通彎曲半徑不大于300mm時(shí),應(yīng)在距彎曲段與直線段結(jié)合處300~600mm的直線段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)彎曲半徑大于300mm時(shí),還應(yīng)在彎通中部增設(shè)一個(gè)支、吊架。支、吊架和橋架安裝必須考慮電纜敷設(shè)彎曲半徑滿足規(guī)范小彎曲半徑。見表3.1.5。

  (1) When laying cable trays horizontally, the support span is generally 1.5-3m. When laying cable trays vertically, the spacing between fixed points should not exceed 2m. When the bending radius of the tray is not greater than 300mm, a support or hanger should be set on the side of the straight section 300-600mm away from the junction of the curved section and the straight section. When the bending radius is greater than 300mm, a support or hanger should be added in the middle of the bend. The installation of supports, hangers, and cable trays must consider that the bending radius of cable laying meets the minimum bending radius specified in the specifications. See Table 3.1.5.

  注為電纜外徑。

  Note the outer diameter of the cable.

  (2)門型角鋼支架的安裝:梯型橋架沿墻垂直敷設(shè),可使用門型角鋼支架,支架的固定應(yīng)盡可能配合土建施工預(yù)埋。如圖3.1.5(2-1),也可在土建施工中預(yù)埋開角螺栓,用開角螺栓固定支架如圖3.1.5(2-1),也可以采用膨脹螺栓固定。

  (2) Installation of door type angle steel bracket: The ladder type bridge is vertically laid along the wall, and door type angle steel bracket can be used. The fixation of the bracket should be embedded as much as possible in conjunction with civil construction. As shown in Figure 3.1.5 (2-1), angle bolts can also be pre embedded in civil construction to fix the bracket as shown in Figure 3.1.5 (2-1), or expansion bolts can be used for fixation.

  (3)梯型角鋼支架的安裝:橋架沿墻、柱水平安裝時(shí),托壁需安裝在異型鋼立柱上,而立柱要安裝在梯型角鋼支架上,使柱和墻上的橋架固定支架(或托臂)在同一條直線上。制作見圖和表3.1.5(3)底架與門型架焊接時(shí),焊角高度5mm。

  (3) Installation of ladder type angle steel bracket: When the bridge is installed horizontally along the wall or column, the support wall needs to be installed on the special-shaped steel column, and the column needs to be installed on the ladder type angle steel bracket, so that the fixed bracket (or support arm) of the column and the bridge on the wall are in the same straight line. When welding the chassis and door frame as shown in Figure 3.1.5 (3), the welding angle height should be 5mm.

  (4)電纜橋架立柱側(cè)壁式安裝:立柱是直接支承托臂的部件,分工字鋼槽鋼、角鋼、異型鋼立柱;立柱可以在墻上、柱上安裝、也可懸吊在梁板上安裝。做法在混凝土可預(yù)埋鐵件;砌體可砌筑預(yù)制砌塊;也可以采用膨脹螺栓但必須在混凝土強(qiáng)度C20或磚強(qiáng)度在MU10以上的磚砌體上,作法可參照3.1.5(4a、b、c、d、e、f)。

  (4) Side wall installation of cable tray columns: The columns are components that directly support the support arms, and are divided into steel channel steel, angle steel, and special-shaped steel columns; Columns can be installed on walls, columns, or suspended from beams and slabs. The method involves embedding iron components in concrete; Prefabricated masonry blocks can be used for masonry construction; Expansion bolts can also be used, but they must be used on brick masonry with concrete strength C20 or brick strength above MU10. The method can refer to section 3.1.5 (4a, b, c, d, e, f).

  (5)電纜橋架應(yīng)敷設(shè)在易燃易爆氣體管和熱力管道的下方,當(dāng)設(shè)計(jì)無要求時(shí),與管道的小凈距,符合3.1.5(5)的規(guī)定。

  (5) Cable trays should be laid below flammable and explosive gas pipelines and thermal pipelines. When there are no design requirements, the minimum clear distance from the pipeline should comply with the provisions of 3.1.5 (5).

  6 托臂安裝:

  Installation of Arm 6:

  托臂是直接支承托盤、梯架單獨(dú)固定的剛性部件,托臂有螺栓固定可預(yù)埋螺栓,也可采用膨脹螺栓,也可卡接,如圖3.1.6(1)、(2)、(3)、(4)、(5)。

  The support arm is a rigid component that directly supports the tray and ladder frame and is fixed separately. The support arm can be fixed with bolts that can be embedded, expansion bolts, or clamped, as shown in Figure 3.1.6 (1), (2), (3), (4), and (5).

  3.2 橋架安裝

  3.2 Bridge installation

  1.直線段鋼制電纜橋架長(zhǎng)度超過30m,鋁合金或玻璃鋼制電纜橋架長(zhǎng)度超過15m應(yīng)設(shè)有伸縮節(jié),跨越伸縮縫處設(shè)置補(bǔ)償裝置,可用帶伸縮節(jié)的橋架。

  1. If the length of a straight steel cable tray exceeds 30m, or if the length of an aluminum alloy or fiberglass cable tray exceeds 15m, expansion joints should be installed. Compensation devices should be installed at the expansion joint crossing points, and cable trays with expansion joints can be used.

  2.橋架與支架間螺栓、橋架連接板螺栓緊固無遺漏,螺母位于橋架外側(cè),當(dāng)鋁合金橋架與鋼支架固定時(shí),有相互間絕緣防電化措施腐蝕措施,一般可墊石棉墊。

  2. The bolts between the bridge and the bracket, as well as the bolts of the bridge connecting plate, are tightened without omission, and the nuts are located on the outside of the bridge. When the aluminum alloy bridge and the steel bracket are fixed, there are mutual insulation and corrosion prevention measures, and asbestos pads can generally be used.

  3.敷設(shè)在豎井內(nèi)和穿越不同防火區(qū)的橋架,應(yīng)按設(shè)計(jì)要求位置,有防火隔離措施,電纜橋架在電氣豎井內(nèi)敷設(shè)可采用角鋼固定,見圖3.1.8。

  3. Cable trays laid in vertical shafts and crossing different fire zones should be located according to design requirements and have fire isolation measures. Cable trays laid in electrical vertical shafts can be fixed with angle steel, as shown in Figure 3.1.8.

  4.電纜橋架在穿過防火墻及防火樓板時(shí),應(yīng)采取防火隔離措施,防止火災(zāi)沿線路延燃;防火隔離墻、板,應(yīng)配合土建施工預(yù)留洞口,在洞口處預(yù)埋好護(hù)邊角鋼,施工時(shí)根據(jù)電纜敷設(shè)的層數(shù)和根數(shù)用L50×50×5角鋼作固定框,同時(shí)將固定柜焊在護(hù)邊角鋼上;也可以先作好框在土建施工中砌體或澆灌混凝土?xí)r安裝在墻、板中。

  4. When cable trays pass through firewalls and fire-resistant floor slabs, fire-resistant isolation measures should be taken to prevent fires from spreading along the line; Fire isolation walls and panels should be equipped with reserved openings for civil construction, and edge protection angle steel should be pre embedded at the openings. During construction, L50 × 50 × 5 angle steel should be used as a fixed frame according to the number of layers and cables laid, and the fixed cabinet should be welded to the edge protection angle steel; Alternatively, the frame can be installed in the wall or slab during masonry or concrete pouring in civil construction.

  3.3 橋架的接地,當(dāng)設(shè)計(jì)允許利用橋架系統(tǒng)構(gòu)成接地干線回路時(shí),應(yīng)符合下列要求:

  3.3 When the design allows the use of the bridge system to form a grounding main circuit, the grounding of the bridge should meet the following requirements:

  1. 金屬電纜橋架及其支架引入或引出的金屬電纜導(dǎo)管必須接地(PE)或接零(PEN)可靠,且必須符合下列規(guī)范:

  1. Metal cable trays and their brackets must have reliable grounding (PE) or neutral (PEN) for the metal cable conduits introduced or led out, and must comply with the following specifications:

  (1) 金屬電纜橋架及其支架全長(zhǎng),與接地(PE)或接零(PEN)干線相連接不小于2處,使整個(gè)橋架為一個(gè)電氣通路。

  (1) The entire length of the metal cable tray and its support shall be connected to the grounding (PE) or neutral (PEN) main line at no less than 2 points, making the entire tray an electrical pathway.

  (2) 非鍍鋅電纜橋架間連接的兩端跨接銅芯接地線,接地線小允許截面積不小于4mm2。

  (2) The two ends of the non galvanized cable tray are connected with copper core grounding wires, and the minimum allowable cross-sectional area of the grounding wire is not less than 4mm2.

  (3) 鍍鋅電纜橋架間連接板的兩端可不跨接接地線,但連接板兩端不少于2個(gè)有防松螺帽或防松墊圈的連接固定螺栓。

  (3) The two ends of the connecting plate between galvanized cable trays may not be connected to the grounding wire, but there shall be no less than 2 fixing bolts with anti loosening nuts or anti loosening washers at both ends of the connecting plate.

  2. 盤、梯架端部之間連接電阻不應(yīng)大于0.00033Ω并應(yīng)用等電位聯(lián)結(jié)測(cè)試儀(導(dǎo)通儀)或微Ω表測(cè)試,測(cè)試應(yīng)在連接點(diǎn)的兩側(cè)進(jìn)行,對(duì)整個(gè)橋架全長(zhǎng)的兩端連接電阻不應(yīng)大于0.5Ω或由設(shè)計(jì)決定,否則應(yīng)增加接地點(diǎn),以滿足要求。接地孔應(yīng)涂層,與涂層接觸的螺栓有一側(cè)的平墊應(yīng)使用帶爪的專用接地墊圈。

  2. The connection resistance between the ends of the tray and ladder should not exceed 0.00033 Ω and should be tested using an equipotential bonding tester (continuity meter) or a micro Ω meter. The test should be conducted on both sides of the connection point, and the connection resistance at both ends of the entire length of the bridge should not exceed 0.5 Ω or be determined by the design. Otherwise, a grounding point should be added to meet the requirements. The grounding hole should eliminate the coating, and the flat pad on one side of the bolt in contact with the coating should use a special grounding washer with claws.

  3. 伸縮縫或軟連接處需采用編織銅線連接。沿橋架全長(zhǎng)另敷設(shè)接地干線時(shí),每段(包括非直線段)托盤、梯架應(yīng)小有一點(diǎn)與接地干線可靠連接;在接地部位的連接處應(yīng)裝置彈簧墊圈,以免松動(dòng)。

  3. Expansion joints or soft connections should be connected using braided copper wires. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the tray and ladder should be reliably connected to the grounding main line at a small point; A spring washer should be installed at the connection point of the grounding part to prevent loosening.

  電纜橋架作為布線工程的一個(gè)配套項(xiàng)目,目前尚無專門的規(guī)范指導(dǎo),個(gè)生產(chǎn)廠家的規(guī)格程式缺乏通用性,因此,設(shè)計(jì)選型過程應(yīng)根據(jù)弱電各個(gè)系統(tǒng)纜顯得類型、數(shù)量,合理選定適用的橋架。(1)確定方向: 根據(jù)建筑平面布置圖,結(jié)合空調(diào)管線和電氣管線等設(shè)置情況、方便維修,以及電纜路由的疏密來確定電纜橋架的路由。在室內(nèi),盡可能沿建筑物的墻、柱、梁及樓板架設(shè),如許利用綜合管廊架設(shè)時(shí),則應(yīng)在管道一側(cè)或上方平行架設(shè),并考慮引下線和分支線盡量避免交叉,如無其它管架借用,則需自設(shè)立(支)柱。

  As a supporting project of wiring engineering, there is currently no specialized specification guidance for cable trays, and the specifications and programs of individual manufacturers lack universality. Therefore, the design and selection process should be based on the type and quantity of cables in various weak current systems, and the appropriate cable tray should be selected reasonably. (1) Determine direction: Determine the optimal route for cable trays based on the building layout plan, combined with the installation of air conditioning and electrical pipelines, convenient maintenance, and the density of cable routing. Indoors, try to install along the walls, columns, beams, and floor slabs of the building as much as possible. When using a comprehensive pipe gallery for installation, parallel installation should be carried out on one side or above the pipeline, and consideration should be given to avoiding crossing of down conductors and branch lines as much as possible. If there are no other pipe racks to borrow, self installing (supporting) columns is required.

  (2)荷載計(jì)算:計(jì)算電纜橋架主干線縱斷面上單位長(zhǎng)度的電纜重量。

  (2) Load calculation: Calculate the weight of cables per unit length on the longitudinal section of the main cable tray.

  (3)確定橋架的寬度:根據(jù)布放電纜條數(shù)、電纜直徑及電纜的間距來確定電纜橋架的型號(hào)、規(guī)格, 托臂的長(zhǎng)度,支柱的長(zhǎng)度、間距,橋架的寬度和層數(shù)。

  (3) Determine the width of the cable tray: Determine the model and specifications of the cable tray, the length of the support arm, the length and spacing of the pillars, the width and number of layers of the cable tray based on the number of cables laid, the diameter of the cables, and the spacing between the cables.

  (4)確定安裝方式:根據(jù)場(chǎng)所的設(shè)置條件確定橋架的固定方式,選擇懸吊式、直立式、側(cè)壁式或是混合式,連接件和緊固件一般是配套供應(yīng)的,此外,根據(jù)橋架結(jié)構(gòu)選折相應(yīng)的蓋板。

  (4) Determine installation method: Determine the fixing method of the bridge according to the setting conditions of the site, choose suspended, upright, side wall or hybrid, and the connectors and fasteners are generally supplied together. In addition, select the corresponding cover plate according to the structure of the bridge.

  (5)繪出電纜橋架平、剖面圖,局部部位還應(yīng)繪出空間圖,開列材料表。

  (5) Draw a plan and section diagram of the cable tray, and also draw a spatial diagram of some parts, and list the material list.

  2、如與電力電纜橋架合用時(shí),應(yīng)將電力電纜和弱電電纜各直一側(cè),中間采用隔板分隔。

  2. When used in conjunction with power cable trays, the power cables and weak current cables should be placed on one side each, and separated by a partition in the middle.

  3、弱電電纜與其它低電壓電纜合用橋架時(shí),應(yīng)嚴(yán)格執(zhí)行選擇具有外屏蔽層的弱電系統(tǒng)的弱電電纜,避免相互間的干擾。

  3. When weak current cables are used in cable trays with other low voltage cables, it is necessary to strictly select weak current cables with external shielding layers to avoid interference between them.

  4、電纜橋架安裝要求

  4. Installation requirements for cable trays

  (1)槽式大跨距電纜橋架由室外進(jìn)入建筑物內(nèi)時(shí),橋架向外的坡度不得小于1/100。(2)電纜橋架與用電設(shè)備交越時(shí),其間的凈距不小于0.5m。

  (1) When the trough type large-span cable tray enters the building from the outside, the outward slope of the tray shall not be less than 1/100. (2) When the cable tray intersects with electrical equipment, the clear distance between them shall not be less than 0.5m.

  (3)兩組電纜橋架在同一高度平行敷設(shè)時(shí),其間凈距不小于0.6m。(4)在平行圖上繪出橋架的路由,要注明橋架起點(diǎn)、終點(diǎn)、拐彎點(diǎn)、分支點(diǎn)及升降點(diǎn)的坐標(biāo)或定位尺寸、標(biāo)高,如能繪制橋架敷設(shè)軸側(cè)圖,則對(duì)材料統(tǒng)計(jì)將更精確。

  (3) When two sets of cable trays are laid in parallel at the same height, the clear distance between them should not be less than 0.6m. (4) When drawing the routing of the tray on a parallel diagram, the coordinates or positioning dimensions and elevations of the starting point, ending point, turning point, branching point, and lifting point of the tray should be indicated. If a cable tray laying axis side diagram can be drawn, the material statistics will be more accurate.

  直線段:注明全長(zhǎng)、橋架層數(shù)、標(biāo)高、型號(hào)及規(guī)格。拐彎點(diǎn)和分支點(diǎn):注明所用轉(zhuǎn)彎接板的型號(hào)及規(guī)格。升降段:注明標(biāo)高變化,也可用局部大樣圖或剖面圖表示。

  Straight line segment: indicate the total length, number of bridge layers, elevation, model, and specifications. Turning and branching points: indicate the model and specifications of the turning joint used. Lifting section: indicate the elevation change, and it can also be represented by local detailed drawings or sectional drawings.

  (5)橋架支撐點(diǎn), 如立柱、托臂或非標(biāo)準(zhǔn)支、構(gòu)架的間距、安裝方式、型號(hào)規(guī)格、標(biāo)高,可同意在平面上列表說明,也可分段標(biāo)出用不同的剖面圖、單線圖或大樣圖表示。

  (5) The spacing, installation method, model specifications, and elevation of bridge support points, such as columns, brackets, or non-standard supports and structures, can be listed and explained on the plane, or segmented and marked with different sectional drawings, single line drawings, or detailed drawings.

  (6)電纜引下點(diǎn)位置及引下方式,一般而言,大批電纜引下可用垂直彎接板和垂直引上架,少量電纜引下可用導(dǎo)板或引管,注明引下方式即可。

  (6) Generally speaking, for a large number of cable leads, vertical bending plates and vertical lead frames can be used, while for a small number of cable leads, guide plates or guide pipes can be used, indicating the lead method.

  (7)電纜橋架宜高出地面2.2米以上,橋架頂部距頂棚或其它障礙物不應(yīng)小于0.3米,橋架寬度不宜小于0.1米,橋架內(nèi)橫斷面的填充率不應(yīng)超過50%。

  (7) The cable tray should be at least 2.2 meters above the ground, and the distance between the top of the tray and the ceiling or other obstacles should not be less than 0.3 meters. The width of the tray should not be less than 0.1 meters, and the filling rate of the cross-section inside the tray should not exceed 50%.

  (8)電纜橋架內(nèi)纜線垂直敷設(shè)時(shí),在纜線的上端和每間隔1.5米處應(yīng)固定在橋架的支架上,水平敷設(shè)時(shí), 在纜線的首、尾、轉(zhuǎn)彎及每間隔3~5米處進(jìn)行固定。

  (8) When the cables are vertically laid in the cable tray, they should be fixed on the brackets of the tray at the upper end and every 1.5 meters. When laid horizontally, they should be fixed at the beginning, end, turn, and every 3-5 meters.

  (9)在吊頂內(nèi)設(shè)置時(shí),槽蓋開啟面應(yīng)保持80毫米的垂直凈空,線槽截面利用率不應(yīng)超過50%。

  (9) When installed in the ceiling, the opening surface of the trough cover should maintain a vertical clearance of 80 millimeters, and the utilization rate of the trough section should not exceed 50%.

  (10)布放在線槽的纜線可以不綁扎,槽內(nèi)纜線應(yīng)順直,槽內(nèi)纜線應(yīng)順直,盡量不交叉,纜線不應(yīng)溢出線槽,在纜線進(jìn)出線槽部位, 轉(zhuǎn)彎處應(yīng)綁扎固定。垂直線槽布放纜線應(yīng)每間隔1.5米固定在纜線支架上。

  (10) The cables laid in the cable trough can be left unbound. The cables inside the trough should be straight and straight, avoiding crossing as much as possible. The cables should not overflow from the trough. They should be tied and fixed at the entrance and exit of the trough, as well as at turns. The cables laid in the vertical cable tray should be fixed on the cable support every 1.5 meters.

  (11)在水平、垂直橋架和垂直線槽中敷設(shè)線時(shí),應(yīng)對(duì)纜線進(jìn)行綁扎。4對(duì)線電纜以24根為束,25對(duì)或以上主干線電纜、光纜及其它信號(hào)電纜應(yīng)根據(jù)纜線的類型、纜徑、纜線芯數(shù)分束綁扎。綁扎間距不宜大于1.5米,扣間距應(yīng)均勻,松緊適度。

  (11) When laying wires in horizontal and vertical cable trays and vertical trunking, the cables should be tied. 4-pair cables should be bundled with 24 cables, and 25 or more pairs of backbone cables, optical cables, and other signal cables should be bundled and tied according to the type, diameter, and number of cable cores. The binding spacing should not exceed 1.5 meters, the buckle spacing should be uniform, and the tightness should be moderate.

  (12)橋架水平敷設(shè)時(shí),支撐間距一般為1.5-3m,垂直敷設(shè)時(shí)固定在建筑物構(gòu)體上的間距宜小于2m。

  (12) When laying the bridge horizontally, the support spacing is generally 1.5-3m, and when laying vertically, the spacing fixed on the building structure should be less than 2m.

  電纜橋架型式及品種的選擇及鋪設(shè)規(guī)范

  Selection and laying specifications for cable tray types and varieties

  一、電纜橋架型式及品種的選擇

  1、 Selection of cable tray types and varieties

  1、需屏蔽電氣干擾的電纜網(wǎng)路或有防護(hù)外部(如:有腐蝕液休,易燃粉塵等環(huán)境)影響的要求時(shí),應(yīng)選用(FB)類槽式復(fù)合型防腐屏蔽電纜橋架(帶蓋)

  1. When it is required to shield cable networks from electrical interference or to protect against external influences (such as corrosive liquids, flammable dust, etc.), (FB) type slot type composite anti-corrosion shielding cable trays (with covers) should be selected

  2、強(qiáng)腐蝕性環(huán)境應(yīng)采用(F)類復(fù)合環(huán)氧樹脂防腐阻燃型電纜橋架。托臂、支架也要選用同樣材料,提高橋架及附件的使用壽命,電纜橋架。在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所宜加蓋板。

  2. For highly corrosive environments, (F) type composite epoxy resin anti-corrosion and flame-retardant cable trays should be used. The same materials should be used for the support arm and bracket to improve the service life of the cable tray and accessories. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover.

  3、除上述情況外,可根據(jù)現(xiàn)場(chǎng)還環(huán)境及技術(shù)要求選用托盤式、槽式、梯級(jí)式、玻璃防腐阻燃電纜橋架或鋼質(zhì)普通型橋架。在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所宜加蓋板。

  3. In addition to the above situations, tray type, trough type, step type, glass anti-corrosion and flame-retardant cable trays or steel ordinary cable trays can be selected according to the on-site environment and technical requirements. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover.

  4、在公共通道或戶外跨越道路段,底層梯級(jí)的底部宜加墊板或在該段使用托盤 。大跨距跨越公共通道時(shí),可根據(jù)用戶要求提高橋架的載荷能力或選用行架。

  4. When crossing public passages or outdoor road sections, it is advisable to add padding or use pallets at the bottom of the lower steps. When crossing public passages with large spans, the load capacity of the bridge frame can be increased or a scaffolding can be selected according to user requirements.

  5、大跨距(>3m)要選用復(fù)合型橋架(FB)。

  5. Composite cable trays (FB) should be selected for large spans (>3m).

  6、戶外要選用復(fù)合環(huán)氧樹指橋架(F)。

  6. Choose composite epoxy tree finger bridge (F) for outdoor use.

  二、電纜橋架規(guī)格選擇

  2、 Selection of cable tray specifications

  1、復(fù)合環(huán)氧樹脂電纜橋架的寬度和高度就按下表選擇,并應(yīng)符合電纜真充率不超過有關(guān)標(biāo)準(zhǔn)規(guī)范的規(guī)定值,動(dòng)力電纜可取40-50%,控制電纜可取50-70%,另外需予留10-25%的式程發(fā)展余量。

  1. The width and height of the composite epoxy resin cable tray should be selected according to the table below, and should comply with the specified values of the cable true filling rate not exceeding the relevant standard specifications. The power cable can be taken as 40-50%, the control cable can be taken as 50-70%, and an additional 10-25% formula development margin should be reserved.

  2、各種彎通及附件規(guī)格應(yīng)符合工程布置條件并與橋架相配套。

  2. The specifications of various bends and accessories should comply with the engineering layout conditions and be compatible with the bridge frame.

  3、支、吊架規(guī)格的選擇,應(yīng)按橋架規(guī)格、層數(shù)、跨距等條件配置。并應(yīng)滿足荷載的要求。

  3. The selection of support and hanger specifications should be configured according to the specifications, number of layers, span, and other conditions of the bridge frame. And it should meet the requirements of the load.

  4、橋架橫截面積的選擇見表橋架上電纜網(wǎng)絡(luò)中任一線路的自動(dòng)過電流保護(hù)的額定電流值或整定值(A) 橋架橫截面充許小值(mm2)0-60 12961-100 258101-200 452201-400 645401-600 968

  4. The selection of the cross-sectional area of the cable tray is shown in the table. The rated current value or setting value of the maximum automatic overcurrent protection for any line in the cable network on the cable tray (A). The minimum allowable cross-sectional area of the cable tray (mm2) is 0-60 12961-100 258101-200 452201-400 645401-600 968

  三、對(duì)于電纜橋架的支、吊架的配置

  3、 Configuration of supports and hangers for cable trays

  1、戶內(nèi)支、吊短跨距一般采取1.5-3m。戶外立柱中跨距一般采取6m。

  1. The short span of indoor supports and hangers is generally 1.5-3m. The mid span of outdoor columns is generally 6m.

  2、非直線段的支、吊架配置就遵循以下原則。當(dāng)橋架寬度<300mm時(shí),應(yīng)在距非直線段與直線結(jié)合處300-600m的直線段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)橋架寬度>300mm時(shí),除符合下述條件外,在非直線段中部還應(yīng)增設(shè)一個(gè)支、吊架。

  2. The configuration of supports and hangers for non-linear sections follows the following principles. When the width of the bridge is less than 300mm, a support and hanger should be installed on the side of the straight section 300-600m away from the junction of the non-linear section and the straight section. When the width of the bridge is greater than 300mm, in addition to meeting the following conditions, a support or hanger should be added in the middle of the non-linear section.

  3、拉擠玻璃鋼電纜橋架多層設(shè)置時(shí)層間中心距為200,250,300,350mm。

  3. When setting up multiple layers of extruded fiberglass cable trays, the center distance between layers is 200250300350mm.

  4、橋架直線段每隔50m應(yīng)予留伸縮縫20-30mm(金屬橋架)。

  4. Expansion joints of 20-30mm (metal bridge) should be left every 50m in the straight section of the bridge.

  四、防火:要求橋架防火的區(qū)段,必須采用鋼制或不燃、阻燃材料。

  4、 Fire prevention: Steel or non combustible and flame-retardant materials must be used in the sections where bridge frames are required to be fire-resistant.

  五、拉擠玻璃鋼電纜橋架的接地

  5、 Grounding of extruded fiberglass cable tray

  1、橋架系統(tǒng)應(yīng)具有可靠的電氣連接并接地(只對(duì)金屬橋架)。

  1. The cable tray system should have reliable electrical connections and grounding (only for metal cable trays).

  2、當(dāng)允許利用橋架系統(tǒng)構(gòu)成接地干線回路時(shí)應(yīng)符合下列要求。橋架端部之間連接電阻應(yīng)不大于0.00033歐姆,接地孔應(yīng)絕緣涂層。在1KV及以下中性點(diǎn)直接接地系統(tǒng)中,受電設(shè)備的接地與系統(tǒng)中性線接地相連。裝有處動(dòng)切斷供電裝軒時(shí),橋架的級(jí)長(zhǎng)方向金屬橫截面積應(yīng)不小于規(guī)定值。

  2. When it is allowed to use a bridge system to form a grounding main circuit, the following requirements should be met. The connection resistance between the ends of the bridge should not exceed 0.00033 ohms, and the insulation coating should be removed from the grounding hole. In a neutral point direct grounding system of 1KV and below, the grounding of the receiving equipment is connected to the neutral line grounding of the system. When installing a power cut-off device, the cross-sectional area of the metal in the longitudinal direction of the bridge should not be less than the specified value.

  3、沿橋架全長(zhǎng)另敷設(shè)接地干線時(shí),每段(包括非直線段)橋架應(yīng)少有一點(diǎn)與接地干線可靠連接。

  3. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the bridge should have at least one point reliably connected to the grounding main line.

  4、對(duì)于振動(dòng)場(chǎng)所,在接地部位的連接處應(yīng)裝置彈簧圈。

  4. For vibration sites, spring coils should be installed at the connection of the grounding point.

  六、橋架系統(tǒng)設(shè)計(jì)內(nèi)容:橋架系統(tǒng)工程設(shè)計(jì)應(yīng)與土建、工藝以及有關(guān)密切相配合以確定布置,其設(shè)計(jì)內(nèi)容可含有:

  6、 Bridge system design content: The bridge system engineering design should be closely coordinated with civil engineering, technology, and related disciplines to determine the optimal layout. Its design content may include:

  1、橋架系統(tǒng)的有關(guān)剖面圖。2、橋架系統(tǒng)的平面布置圖。3、橋架系統(tǒng)所需直線段、彎通、支、吊架規(guī)格和數(shù)量的明細(xì)表以及必要的說明。4、有特殊要求的非標(biāo)件技術(shù)說明或示意圖。

  1. Relevant sectional drawings of the bridge system. 2. Layout plan of the bridge system. 3. A detailed list of specifications and quantities of straight sections, bends, supports, and hangers required for the bridge system, along with necessary explanations. 4. Technical specifications or diagrams for non-standard parts with special requirements.

  七、安裝:電纜橋架的安半夜請(qǐng)參照建筑標(biāo)準(zhǔn)設(shè)計(jì)研究院所發(fā)行的JSJT-121全國(guó)通用建筑標(biāo)準(zhǔn)設(shè)計(jì)-電氣裝置標(biāo)準(zhǔn)圖集《電纜橋架安裝》。

  7、 Installation: For the installation of cable trays, please refer to the JSJT-121 National General Building Standard Design Electrical Equipment Standard Atlas "Cable Tray Installation" issued by the China Building Standards Design and Research Institute.

  八、設(shè)計(jì)要求

  8、 Design requirements

  1、橋架系統(tǒng)的路徑平面布置圖;

  1. Layout plan of the cable tray system path;

  2、橋架系統(tǒng)的有關(guān)斷面圖。

  2. The relevant cross-sectional diagram of the bridge system.

  3、橋架系統(tǒng)所用防腐材質(zhì)及所需直通、彎通、支(吊)架等的規(guī)格和數(shù)量明細(xì)表以及必要的說明,連接板及螺絲、防護(hù)帽按以上要求由生產(chǎn)廠家配齊。4、有特殊要求的非標(biāo)準(zhǔn)技術(shù)說明或示圖。

  3. The anti-corrosion materials used in the bridge system, as well as the specifications and quantities of the required straight through, bent through, support (suspension) frames, and necessary explanations, shall be detailed. The connecting plates, screws, and protective caps shall be provided by the manufacturer in accordance with the above requirements. 4. Non standard technical specifications or diagrams with special requirements.

  一、電纜橋架型式及品種的選擇

  1、 Selection of cable tray types and varieties

  1、需屏蔽電氣干擾的電纜網(wǎng)路或有防護(hù)外部(如:有腐蝕液休,易燃粉塵等環(huán)境)影響的要求時(shí),應(yīng)選用(FB)類槽式復(fù)合型防腐屏蔽電纜橋架(帶蓋)   2、強(qiáng)腐蝕性環(huán)境應(yīng)采用(F)類復(fù)合環(huán)氧樹脂防腐阻燃型電纜橋架。托臂、支架也要選用同樣材料,提高橋架及附件的使用壽命,電纜橋架。在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所宜加蓋板。  3、除上述情況外,可根據(jù)現(xiàn)場(chǎng)還環(huán)境及技術(shù)要求選用托盤式、槽式、梯級(jí)式、玻璃防腐阻燃電纜橋架或鋼質(zhì)普通型橋架。在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所宜加蓋板。  4、在公共通道或戶外跨越道路段,底層梯級(jí)的底部宜加墊板或在該段使用托盤 。大跨距跨越公共通道時(shí),可根據(jù)用戶要求提高橋架的載荷能力或選用行架?! ?、大跨距(>3m)要選用復(fù)合型橋架(FB)。

  1. When it is required to shield cable networks from electrical interference or to protect against external influences (such as corrosive liquids, flammable dust, etc.), (FB) type slot type composite anti-corrosion shielding cable trays (with covers) should be selected. 2. For highly corrosive environments, (F) type composite epoxy resin anti-corrosion and flame-retardant cable trays should be used. The same materials should be used for the support arm and bracket to improve the service life of the cable tray and accessories. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover. 3. In addition to the above situations, tray type, trough type, step type, glass anti-corrosion and flame-retardant cable trays or steel ordinary cable trays can be selected according to the on-site environment and technical requirements. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover. 4. When crossing public passages or outdoor road sections, it is advisable to add padding or use pallets at the bottom of the lower steps. When crossing public passages with large spans, the load capacity of the bridge frame can be increased or a scaffolding can be selected according to user requirements. 5. Composite cable trays (FB) should be selected for large spans (>3m).

  6、戶外要選用復(fù)合環(huán)氧樹指橋架(F)。

  6. Choose composite epoxy tree finger bridge (F) for outdoor use.

  二、規(guī)格選擇

  2、 Specification selection

  1、橋架的寬度和高度就按下表選擇,并應(yīng)符合電纜真充率不超過有關(guān)標(biāo)準(zhǔn)規(guī)范的規(guī)定值,動(dòng)力電纜可取40-50%,控制電纜可取50-70%,另外需予留10-25%的式程發(fā)展余量?! ?、各種彎通及附件規(guī)格應(yīng)符合工程布置條件并與橋架相配套?! ?、支、吊架規(guī)格的選擇,應(yīng)按橋架規(guī)格、層數(shù)、跨距等條件配置。并應(yīng)滿足荷載的要求?! ?、橋架橫截面積的選擇見表   橋架上電纜網(wǎng)絡(luò)中任一線路的自動(dòng)過電流保護(hù)的額定電流值或整定值(A) 橋架橫截面充許小值(mm2)   0-60 129   61-100 258   101-200 452   201-400 645   401-600 968

  1. The width and height of the cable tray should be selected according to the table below, and should comply with the specified values of the cable true filling rate not exceeding the relevant standard specifications. The power cable can be taken as 40-50%, the control cable can be taken as 50-70%, and an additional 10-25% of the formula development margin should be reserved. 2. The specifications of various bends and accessories should comply with the engineering layout conditions and be compatible with the bridge frame. 3. The selection of support and hanger specifications should be configured according to the specifications, number of layers, span, and other conditions of the bridge frame. And it should meet the requirements of the load. 4. The selection of the cross-sectional area of the cable tray is shown in the table. The rated current value or setting value of the maximum automatic overcurrent protection for any line in the cable network on the tray (A). The minimum allowable cross-sectional area of the tray (mm2) is 0-60 129 61-100 258 101-200 452 201-400 645 401-600 968

  三、支、吊架的配置

  3、 Configuration of supports and hangers

  1、戶內(nèi)支、吊短跨距一般采取1.5-3m。戶外立柱中跨距一般采取6m。

  1. The short span of indoor supports and hangers is generally 1.5-3m. The mid span of outdoor columns is generally 6m.

  2、非直線段的支、吊架配置就遵循以下原則。當(dāng)橋架寬度<300mm時(shí),應(yīng)在距非直線段與直線結(jié)合處300-600m的直線段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)橋架寬度>300mm時(shí),除符合下述條件外,在非直線段中部還應(yīng)增設(shè)一個(gè)支、吊架。

  2. The configuration of supports and hangers for non-linear sections follows the following principles. When the width of the bridge is less than 300mm, a support and hanger should be installed on the side of the straight section 300-600m away from the junction of the non-linear section and the straight section. When the width of the bridge is greater than 300mm, in addition to meeting the following conditions, a support or hanger should be added in the middle of the non-linear section.

  3、橋架多層設(shè)置時(shí)層間中心距為200,250,300,350mm。

  3. When setting up multiple layers of cable trays, the center distance between layers is 200250300350mm.

  4、橋架直線段每隔50m應(yīng)予留伸縮縫20-30mm(金屬橋架)。

  4. Expansion joints of 20-30mm (metal bridge) should be left every 50m in the straight section of the bridge.

  四、防火

  4、 Fire prevention

  要求橋架防火的區(qū)段,必須采用鋼制或不燃、阻燃材料。我公司生產(chǎn)的BJⅢ系列電纜橋架均為防火橋架。

  The section requiring bridge fire prevention must be made of steel or non combustible and flame-retardant materials. The BJ III series cable trays produced by our company are all fire-resistant trays.

  五、接地

  5、 Grounding

  1、橋架系統(tǒng)應(yīng)具有可靠的電氣連接并接地(只對(duì)金屬橋架)。

  1. The cable tray system should have reliable electrical connections and grounding (only for metal cable trays).

  2、當(dāng)允許利用橋架系統(tǒng)構(gòu)成接地干線回路時(shí)應(yīng)符合下列要求。橋架端部之間連接電阻應(yīng)不大于0.00033歐姆,接地孔應(yīng)絕緣涂層。在1KV及以下中性點(diǎn)直接接地系統(tǒng)中,受電設(shè)備的接地與系統(tǒng)中性線接地相連。裝有處動(dòng)切斷供電裝軒時(shí),橋架的級(jí)長(zhǎng)方向金屬橫截面積應(yīng)不小于規(guī)定值。

  2. When it is allowed to use a bridge system to form a grounding main circuit, the following requirements should be met. The connection resistance between the ends of the bridge should not exceed 0.00033 ohms, and the insulation coating should be removed from the grounding hole. In a neutral point direct grounding system of 1KV and below, the grounding of the receiving equipment is connected to the neutral line grounding of the system. When installing a power cut-off device, the cross-sectional area of the metal in the longitudinal direction of the bridge should not be less than the specified value.

  3、沿橋架全長(zhǎng)另敷設(shè)接地干線時(shí),每段(包括非直線段)橋架應(yīng)少有一點(diǎn)與接地干線可靠連接。

  3. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the bridge should have at least one point reliably connected to the grounding main line.

  4、對(duì)于振動(dòng)場(chǎng)所,在接地部位的連接處應(yīng)裝置彈簧圈。

  4. For vibration sites, spring coils should be installed at the connection of the grounding point.

  六、橋架系統(tǒng)設(shè)計(jì)內(nèi)容

  6、 Design content of bridge system

  橋架系統(tǒng)工程設(shè)計(jì)應(yīng)與土建、工藝以及有關(guān)密切相配合以確定布置,其設(shè)計(jì)內(nèi)容可含有:

  The design of bridge system engineering should be closely coordinated with civil engineering, technology, and relevant disciplines to determine the optimal layout, and its design content may include:

  1、橋架系統(tǒng)的有關(guān)剖面圖。

  1. Relevant sectional drawings of the bridge system.

  2、橋架系統(tǒng)的平面布置圖。

  2. Layout plan of the bridge system.

  3、橋架系統(tǒng)所需直線段、彎通、支、吊架規(guī)格和數(shù)量的明細(xì)表以及必要的說明。

  3. A detailed list of specifications and quantities of straight sections, bends, supports, and hangers required for the bridge system, along with necessary explanations.

  4、有特殊要求的非標(biāo)件技術(shù)說明或示意圖。

  4. Technical specifications or diagrams for non-standard parts with special requirements.

  七、安裝

  7、 Installation

  電纜橋架的安半夜請(qǐng)參照建筑標(biāo)準(zhǔn)設(shè)計(jì)研究院所發(fā)行的JSJT-121全國(guó)通用建筑標(biāo)準(zhǔn)設(shè)計(jì)-電氣裝置標(biāo)準(zhǔn)圖集《電纜橋架安裝》04D701-3。

  For the installation of cable trays, please refer to the JSJT-121 National General Building Standard Design Electrical Equipment Standard Atlas "Cable Tray Installation" 04D701-3 issued by the China Building Standards Design and Research Institute.

  八、設(shè)計(jì)要求

  8、 Design requirements

  1、橋架系統(tǒng)的路徑平面布置圖;

  1. Layout plan of the cable tray system path;

  2、橋架系統(tǒng)的有關(guān)斷面圖。

  2. The relevant cross-sectional diagram of the bridge system.

  3、橋架系統(tǒng)所用防腐材質(zhì)及所需直通、彎通、支(吊)架等的規(guī)格和數(shù)量明細(xì)表以及必要的說明,連接板及螺絲、防護(hù)帽按以上要求由生產(chǎn)廠家配齊。

  3. The anti-corrosion materials used in the bridge system, as well as the specifications and quantities of the required straight through, bent through, support (suspension) frames, and necessary explanations, shall be detailed. The connecting plates, screws, and protective caps shall be provided by the manufacturer in accordance with the above requirements.

  4、有特殊要求的非標(biāo)準(zhǔn)技術(shù)說明或示圖。

  4. Non standard technical specifications or diagrams with special requirements.

  本文由  濟(jì)南電纜橋架  友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊  http://zrbg1.com/  真誠的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待.

  This article is a friendly contribution from Jinan Cable Bridge For more related knowledge, please click http://zrbg1.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
中文字幕蜜臀AV熟女人妻| 国产一区二区精品无码| 亚洲最大av在线| 麻豆出品视频在线| 欧美精品 - 色哟哟| 亚洲一区二区三区四区五区六区| 超碰在线免费看| 亚洲天堂性| 久久久久久久av毛片| 精品一区中文字幕| 亚洲精品v| 91看片鸡巴大| 亚洲欧美一区二区三区孕妇 | 日本一区二区精品| 日韩无码1区2区3区| 亚洲激情在线| 韩国免费理论片A级奶大| 亚洲午夜精品A片久久WWW软件| 丁香激情五月| 精品国产乱码久久久久久图片 | 免费毛片网站| Av黄色网址| 精品国产乱码久久久国产| а中文在线天堂| 国产精品1| 琪琪午夜伦伦电影理论片A片| 人与人和人与物XXX| 欧美亚洲高清国产| 云南抹黑节狂欢:他们连狗也不放过| 午夜精品在线播放| 日产亚洲一区二区三区| 丁香五月激情视频| 中文字幕日本六区小电影| 亚洲无码精彩视频| 亚洲精品美女| 无码三级视频| 国精产品W灬源码1688伊在| 亚洲v视频| 国产经典久久久| 亚洲97视频| 精品久久久噜噜噜久久久| 日本不卡一区| 国产美女黄性色A片| 亚洲精品天堂无码| 久久精品一| 羞羞影院| 卡一卡二卡三国产拍| 欧美国产激情二区三区-免费A片 | 国产日韩欧美一区二区| 99久久免费看少妇高潮A片| 亚洲一区二区小说| 久久激情网站| 日韩精品网站| 最近最新MV中文字幕国语免费| 色老头在线一区二区三区 | 91精品国产综合久久香蕉922| 黄页在线观看| 男女猛烈无遮掩视频免费软件| 手机青青在线观看国产| 亚洲精品福利在线| 少妇高潮喷潮久久久影院| 免费AV岛国大片在线观看| WWW亚洲精品久久久无码| 男人资源在线| 操你综合| 国产精品综合网| 麻豆传煤网站APP下载| 自拍 另类 图片区 亚洲| 熟妇高潮一区二区精品午夜无码| 日韩高清黄色| 美女祼体添鸡把图片| 五月婷婷激情第四季| 日韩黄片在线免费观看| 99成人在线视频| 麻豆视传媒短视频免费官网| 亚洲综合免费视频| 粉嫩99精品99久久久久久桃色| 琳琅社区600ucom美欧高清| 快播看大黄| 雷军官宣小米造芯| 日韩毛片网址| 成人无码网站| 一区二区三区黄片| 777影院秋霞成人午夜电影免费| 亚洲狼友视频| 男人扒女人添高潮视频| 成 人 黄 色 免费 观 看| 大地资源第二页在线观看完整版| 干日韩美女| 少妇AAA级久久久无码精品片| 狼群视频在线观看播放| 黄色小说在线| 久久久一本| 另类ts人妖一区二区三区| 日本最新中文字幕| 日韩激情毛片| 成人熟女视频| 国产99久9在线视频传媒| 亚洲另类色图| 精品99久久| 高清一本视频在线观看| 久久福利精品| aV偷拍自拍| 小蝌蚪app| 美女亚洲一区| 国产精品色哟哟| 无码人妻精品一区二区三区99仓| 国产污视频在线| 成全视频在线观看免费播放| 国产精品久久久久久久裸模| 精品欧美乱码久久久久久1区2区| 麻豆国产在线视频| 天天日天天搞| 极品美鲍一线天| 日韩欧美视频二区| 久久精品视在线看1| 国产99精品在线观看| 日韩毛片基地| 麻豆视传媒短视频在线观| 黄片av在线免费观看| 日韩欧美亚洲国产| 青青青国产在线观看手机免费| 亚洲无码TV| 天天日日操| 日本亚洲欧洲另类图片| 99福利网| 琪琪电影网午夜理论片717西瓜| 亚洲人欧洲人非洲人基因差别| 亚洲欧洲在线视频| 国产乱伦电影| 精品无码人妻| 亚洲第一二三区| 日韩中文字幕综合| 久久精品国产欧美日韩99热| www三级片| 麻豆传煤网站APP入口直接进入在线 | 激情五月综合网| 日韩视频在线一区| 伊人中文| 少妇激情综合| 国产欧美日韩| 99精品国产99久久久久97| 飘花电影网| 日韩欧美午夜成人无码| av黄色在线| 五月丁香视频在线| 97人人爽| 一曲二曲在线看| 欧美日韩在线电影| 国产亚洲精品VA片在线播放| 亚洲高清在线| 精品成人一区| 最新日韩无码| 国产欧美一区二区三区18| 欧美狠狠干| 日韩激情视频无码| 精品国产免费一区二区三区香蕉| 国产色精品VR一区二区| 老司机无码| av蜜臀| 午夜精品网站| 蜜臀AV久久国产午夜福利软件| 97人妻人人揉人人躁原| 人体欣赏SHOWYBEAUTY| 91综合视频| 动漫h快播| 91天天操| 91麻豆国产精品91久久久| 中文一区在线观看| 亚洲国产精品VA在线看黑人 | 无毒成人网站网址| 国产午夜一区二区| 五月丁香五月伦理| 青青草国产精品久久久久婷婷 | 暖暖视频免费观看视频中国...| 日韩欧美小电影| 国产日韩高清一区二区三区| 伊人影院亚洲| 国产亚洲AV综合一区二区A片| 老司机一区二区| 欧亚成人精品一区二区| 三级久久久| 国产操比| 狠狠爱综合| 高清不卡无码视频| 激情小说激情视频| 欧美一区一区| 国产一区内射最近更新| 国产中文字幕在线观看| 大香蕉伊人在线播放| 成人黄色无码视频| AV在线无码| 国产91综合一区在线观看| 久久视频中文字幕| 少妇超碰| 窝窝在线视频| 亚洲AV无码一区二区三区乱子伦| 亚洲成人一二三| 天天操天天爽天天干| 久久精品免费看| 亚洲性小说| 天堂电影| 久久亚洲AV成人出白浆无码国产| CHINESE性内射高清国产| 日韩黄色电影院| 久久国产精品影院| 福利 无码 三级 视频| 日韩av自拍| 91麻豆国产精品91久久久 | 精品国产乱码久久久久久口爆| 欧美极品护士VIDEOSVIDEO| 伊朗一港口发生高强度爆炸| 99久久99久久免费精品不卡| 国产日韩欧美一区| 91人人妻| 色偷偷AV亚洲男人的天堂| 黄色av无码在线观看| 欧美精品久久久极品| 99热这里有精品| 懂色av懂色av粉嫩av分享吧| 最近更新中文字幕2019高清一页 | 超碰激情| 国产gay片| 国产无套内射久久久国产| 国产精品视频一区二区三区不卡| 精品理论片| 免费无码毛片一区二区APP| 中文日韩字幕| 亚洲欧美日韩中文在线制服| 亚洲人妻天堂| 欧美精品1| 久久视频这里只精品99re8久| 色综合精品| www黄片com| AV天堂午夜精品一区| 叼嘿视频| 能免费看18视频网站| 国产亚洲一区二区在线观看 | 欧美精品一区二区三区蜜臀| 日本一区二区三区在线观看 | 欧洲成人午夜精品无码区久久| 国产精品国产精品国产专区不片| 亚洲丰满爆乳熟女在线观看| 黄色成人无码| 后入内射无码人妻一区| 最好看2019中文在线播放电影| 久久久久久黄片| 天天射天天射天天干天天亲天天狠| 大地影视资源官网第二页| jazzjazz国产精品传媒| 欧美福利在线视频| 一本本月无码-| 一本色道久久亚洲综合精品蜜桃| 午夜福利小电影| 成全视频大全高清全集在线| 国产拗女一区二区三区| 国产精品午夜影院| 欧美日韩在99线| 色欲AV亚洲午夜精品无码电影| 日本熟女色| 亚洲精品久久久久久久观看| 日韩欧美国产一区二区三区| 天天摸天天干天天操| 日本精品视频在线播放| 91香蕉视频在线| 国产区一区| 伊人精品综合| 国产亚洲一区二区在线观看| 99国精产品W灬源码1688| 国产精品无码久久| 午夜啪视频| 天堂官网在线资源网| 国产欧美另类| 久草久草久草久草| 欧美激情一二三| 蜜桃视频一区二区| 激情福利社| 青青依人| 欧美性爱视频免费看| 狠狠爱亚洲五月婷婷av| 超碰三级| 国产精品96| 精品人妻中文字幕视频| AV夜夜躁狠狠躁日日躁| 亚洲av片不卡无码久久| 亚洲抛九九九一三一二区| 日韩不卡AV在线| 麻豆传煤网站APP下载| 久草热视频| 欧美日韩理论| 国产一精品一aⅴ一免费| 麻豆传煤网站入口下载| 久草婷婷| 亚洲九九九九| 亚洲精品婷婷| 亚洲AV鲁丝一区二区三区 | 办公室里呻吟的丰满老师电影| 国产精品免费看久久久无码| av免费在线不卡| 亚洲黄色电影网站| 国产精品久久久久久久毛片| 成全视频在线观看下载 | 伊人精品影院| 国产香蕉视频在线| 天天鲁在视频在线观看| 精品久久一区| 日本亚洲精品| 人人干人人澡| 亚洲国产毛片| 精品一二三区久久AAA片| 桃花社区在线观看视频| 亚洲欧美日韩精品| 亚洲日本一区二区三区| 一级色网站| Av天堂精品| 少妇高潮A片特黄久久精品网| 320电影网| 欧洲亚洲精品| 26UUU精品一区二区COm| 精品九九久久| 大地资源二中文在线观看| 少妇人妻人伦A片| 欧美一二三区| 精品久久久久久无码囯产| 在线精品无码| 午夜天堂精品久久久久91| 国产精品13p| 开心五月综合亚洲| 久久久GOGO无码啪啪艺术| 色婷婷视频在线| 亚洲三级中文字幕| 懂色AV无码中字幕一区| 久久免费大片| 欧美性爱高清无码| 9277在线完整视频观看免费| 最近2019好看的中文字幕免费| 免费人成精品欧美精品| 中文字幕无码在线| 禁果AV一区二区夜夜嗨| 天堂成人视频| 久久久久久久久99精品| 日韩激情四射| 成人色综合网| 中文字幕+乱码+中文乱码91| 一本到高清视频不卡dvd日本| MD传媒免费进入在线观看| 亚欧无码人妻XXXX| 国产精品久久av| 少妇x88AV| 亚州精品免费视频| 黄片免费在线播放| 无码一区二区三| 爱爱无码久久| 国产AV亚洲国产AV麻豆| 大地资源在线影视播放| 国产国拍精品AV在线观看| 午夜DV内射一区二区| 12一15女人A毛片| 国产午夜无码视频在线观看| 色呦呦在线观看视频| 影视一区二区三区| 久久久久久电影| 欧美日韩毛片| 欧美XOXO| 久久亚洲区| 黄片免费播放站| 无码日本精品一区二区三| 国产偷抇久久精品A片蜜臀A| 男女激烈床震GIF动态图免费| 国产视频第二页| 久久国产AV| 日本在线一区二区| 精品无码人妻少妇久久久久久| 亚洲AV日韩在线| 亚洲欧美综合一区二区| 亚洲夜夜夜| 亚洲永久精品一区| 国产精品久久无码一三区| 日本精品视频一区二区三区| 亚洲色国产| 91性爱小视频| 亚洲国产精品999| 人人妻网站| 国产亚洲精品久久精品6| 国产欧美一区二区三区免费视频| 香蕉人妻AV久久久久天天| 欧美肉大捧一进一出免费视频| 免费无毒a网站在线观看| 亚洲精品久久久久无码AV| 麻豆一区二区免费播放网站| 免费无码毛片一区二区APP| www.色网站| 中文字幕AV无码一区二区三区| AV电影一区二区三区| 无码欧美精品一区二区免费式影视| 欲色av| a∨色狠狠一区二区三区| 丁香五月天视频| 国产亚洲综合无码| 久久精品资源| 啪啪精品| 丰满熟妇猛性bbwbbw| www黄片com| 国产激情无码一区二区免费| 狠狠狠狠狠| 曰本av| 国产a自拍| 影视一区二区三区| 熟妇在线播放| 网红av在线| 97国产超碰| 中文字幕亚洲国产| 欧美黑人性爽| 日韩导航| 亚洲欧洲免费视频| 日韩a级片| 国产一区二区在线视频| 色老大网站| 亚洲国产AV一区二区三区四区 | 色234| 大地资源中文第二页日本| 芭乐app下载汅api幸福宝| 麻豆传煤网站APP入口直接进入在线 | 久久国产v一级毛多内射| 久久亚洲AV日韩AV无码A| 国产农村妇女毛片精品久久久久 | 少妇无码无套av一区| 国产熟女熟妇| 亚洲欧美一区二区三区孕妇| 国产精品99久久久久久人| 日本免费久久| 国产一区二区三区中文字幕| 久久午夜电影网| 日韩一区二区三区无码A片| 麻豆视传媒短视频的服务行业 | 老湿机福利视频| 亚洲欧美日韩成人在线| 国产成人无码不卡精品久久久| 福利片一区| 人妻熟女在线看| 亚洲色美女| 黄色成人在线视频| 91香蕉| 日本高清一区| 免费MD传媒官方网站入口进入| 五月开心播播网| 日本亚洲欧洲另类图片| 日韩精品一区二区三区色欲AV| 美女自慰免费网站| 欧美日韩中文字幕在线| 91天天爽| 影音先锋麻豆| 欧美日本精品| 久久亚洲AV成人无码国产野外| 午夜时刻免费实验区观看| 亚洲男神官网| 精品深夜AV无码一区二区老年 | 日韩久久久| AV人人干| 丝袜熟女一区二区三区| 久久无码精品| 大香线蕉视频在线观看6| 大香线蕉视频在线观看| 久久影院视频| 亚洲精选一区二区三区| 视频你懂的| 97超碰免费人妻| 无码黄色网址| 最好看十大无码AV| 人妻交奸日记| 天堂资源在线播放| 日本中文一区| 国产女人18毛片水真多18| 日日操夜夜操狠狠操| 成全视频免费高清| 在线观看网址入口2020| 精品AV综合导航| 一级久久久| 欧美日韩1区2区3区| 国产高清久久| 欧美精品1区2区3区| 在线亚洲人成电影网站色www| 麻豆传煤app官网网页入口下载| 猫咪WWW免费人成软件下载| 99热精品一区| 无码破解中文字幕| 91久久中文精品无码中文字幕| 久久久男人的天堂| 偷拍 拍自 欧美色区| 成全免费高清大全| 精品美女久久久| 国产亚洲综合精品| 国产精视频| 午夜精品久久久久久久| 台湾MD豆传媒APP网址入口| J8又粗又硬又大又爽又长网站| 欧美在线观看一区二区| 日本亚洲在线| 性做久久久久久| 欧美激情亚洲激情| 麻豆免费国产福利视频| 一级黄色免费网站| 另类综合网| 无码中文字幕在线| 天堂网av在线| 99久久国产露脸人妻精品| 日韩AV福利| 欧美激情图| 五月丁香激情在线| 麻豆传煤一区免费入站口| 开心五月色婷婷综合开心网| 天天干天天日天天色| 国产精品无码人妻无码色情多人| 国产一二三四五区| 久久久久无码精品国产699 | 小麻豆| 久久久国产精品免费A片分环卫 | 久久久精品毛片| 6080YYY午夜理论AA片| 777毛片| 黑丝一区| 涩里番免费一区二区三区| 中文字幕人妻无码| 成全的视频高清完整在线观看| 97资源超碰在线| 一区二区三区黄色| 欧美日韩亚洲国产综合| 久久精品黄AA片一区二区三区| 中文在线√天堂| 欧美精品一二三| 无码久久精品国产亚洲AV影片| 麻豆文化传媒官方网站| 99热99| 久久婷婷国产麻豆91天堂| xxxx欧美| 成人AV久久一区二区三区| 美女视频网站免费| 国产精品一区在线播放| 国产三级在线| WWW亚洲精品久久久无码| 欧美美女自慰| 亚洲AV成| 久久99这里只精品热在线| 麻豆一区二区免费播放网站| 成人无码高清视频| 午夜福利激情| 日韩不卡一卡二卡3卡四卡2021免费 | 天天操网站| 大地资源二中文在线播放免费| 国内自拍AV| 亚洲精品www久久久久久| 亚洲AV无码一区二区三区牛牛| 色开心| 日韩精品成人无码专区免费| 国产欧美日韩综合| 成AV免费大片黄在线观看| 日韩无码久| 四虎永久免费在线观看| 麻.COM豆传媒| 亚洲免费视频一区| 无码人妻精品一区二区蜜桃视频| 精品一区二区三区AV天堂 | 亚洲精品国产精品国自产网站| 色综合欧美| 亚洲一区无码| 国产人妻一区二区三区久| 骚虎av| 日本免费一区二区三区| 人妻少妇被粗大爽9797PW| 国产天堂久久| 久久综合九色| 无码免费人妻A片AAA毛片西瓜| 欧美日本激情| 麻豆AV在线| 亚洲 欧洲 日产 经典| 黑人三级视频| 人妻少妇偷人精品无码不卡| 公车上疯狂高潮呻吟摸揉| 欧美日韩1区2区3区| 无码日韩视频| 亚洲 图 欧洲 自拍 图片| 国产蜜臀AV| 亚洲啪啪啪| 久久久精品日本一区二区三区| 成人久久视频| 欧美色色网| 官方福利网站第一福利导航 | 欧美日韩激情视频| 精品AV综合一区二区三区| 四虎影院一区二区| 亚洲内射无码| 熟女倶楽部1011熟女倶楽部| av你懂的| 一区二区三区在线播放| 秋霞又粗又硬又大又爽| 久久久老熟女一区二区三区| 2019久久视频国产| 久久福利精品| 人妻体内射精一区二区| 四虎永久在线精品国产免费| 天天射天天操天天日| 野草乱码一区四区区别| 丝袜美腿AV在线| 成人免费在线观看视频| 开心五月色婷婷综合开心网| 欧洲高清无码| 天堂资源中文| 国产欧美一区二区md19| 天天操狠狠操| 大香线蕉视频在线观看6| 久久大胆人体| 在线 国产 欧美 专区| 免费黄色av网站| 日日摸夜夜爽| 国产成人区| 97精品久久久| 亚洲日本久久久午夜精品| 中国美女AV| 91国视频在线观看| 日韩免费黄色片| 人妻第一页| 污污内射久久一区二区欧美日韩| 无码成人AV在线看免费| 欧美极品护士VIDEOSVIDEO| www.啪啪啪.com| 91丨porny丨中文| 国产无码资源| 久久亚洲激情| 欧美视频不卡| 天天射综合| 抽插嗯好爽好舒服好大| 好好日天天干| 欧美乱码卡一卡二卡四卡免费| 少妇视频一区二区| uuzyz悠悠资源影音先锋| 一区二区三区无码高清| 激情视频激情图片激情小说| 欧美三级黄| 日韩综合久久| 欧美熟妇激情| 国产区一区| 2022四虎4HU新地址入口| 国产精品一区二区无码| 大地影视中文资源官网| 国产黄片免费视频| 久久AV无码精品人妻系列试探| 久久久亚洲一区| 乳罩脱了喂男人吃奶视频| 午夜久久无码成人免费AV麻豆婷| A片日本人妻偷人妻人妻| 亚洲色综合网| av中文字幕网| 激情四射网站| 色噜噜网站| 亚洲毛片免费在线观看| 韩日视频在线观看| 国产三级片网址| 久久六月天| 欧美XOXO| 麻豆一区二区免费播放网站| 日本三级a| 香蕉视频色| 国产欧美一区二区三区在线看蜜臂| 蜜桃亚洲AV无码一区二区三区 | 久久99爱爱精品| 亚洲精品一二三| 国产精品人妻互换AV一86| 国产伦精品一区二区三区免费下载| 国产精品精品久久久| 亚洲欧美一区二区三区久久| 日日夜夜亚洲| 日韩欧美精品一区二区| 无码特级毛片免费视频| 国产精品久久丫毛片A片软件 | 亚洲iv一区二区三区| 亚洲一区二区免费| 91国视频在线观看| 91天天爽| 中韩高清无专码区2021曰| 欧美一级特黄特黄大片连接| 最近中文字幕MV免费高清下载| 亚洲三级色| 视频一区麻豆国产传媒| 少妇喷水在线观看| 国产丰满人妻一区二区电影 | 九九精品在线视频| 91免费污| 大香伊蕉人在播放2019| 91精品久久久老熟女九色91| 四平青年全集优酷| 色噜噜色综合| 久久91精品国产91久| 久久久久国产精品一区二区| 天天舔天天舔| 国产成人AV一区二区在线观看| 五月婷婷一区二区| 日本网址在线观看| 亚洲第一成人网站| 婷婷丁香五月激情综合在线| 日本中文字幕视频| 麻豆传媒AV在线观看| 亚洲国产中文字幕| 精品久久久久久久久久岛国gif| 午夜精品国产| 青青免费视频观看在线视频 | YYY111111日本无码| 日韩AV网站在线| 五月色婷婷丁香无码三级| 四虎综合网| 国产精品久久久久久99| 一区二区三区线日本| 99精品国产成人一区二区| 搐搐国产丨区2区精品AV| 国产69精品久久久孕妇| 无码三区四区| 精品久久久久久久| 亚洲熟妇xxXxX| 日欧精品卡2卡3卡4卡| 国产精品久久久久AAAA| 午夜福利国产在线观看| 91麻豆视频| 欧美伦理在线观看| 99re最新在线精品| 中文字幕一区二区三区夫目前犯| 欧美电影一区二区三区| 亚洲精品久久久久无码AV| 国产Av直播| 欧美性生交XXXXX无码十全| 国产欧美日韩在线观看| 日本久久精品视频| 久久久精品久久久久久久久久久| 国产婷婷在线观看| 九九激情视频| 在线视频久久只有精| 麻豆精品国产传媒AV| 《隔壁人妻》波多野结衣| 无码国产一区二区三区| videos另类灌满极品另类| 伊人影院香蕉久在线26| 国产寡妇亲子伦一区二区三区四区| 精品少妇一区二区三区四区五区 | 欧美日韩色情| 麻豆传煤入口直接进入免费版| 国产高清二区| 久久久99国产精品不卡喷水| 亚洲国产一区二区三区四区色欲| 中国老女人操逼视频| 国产亚洲欧美日本一二三本道| 午夜精品久久久久久久久久蜜桃| 推油视频| 青草影院内射中出高潮| √天堂午夜无码久久va| 国产日韩高清无码| 色翁荡熄又大又硬又粗又视频软件| 欧洲熟妇色| 人妻激情偷乱视91九色| 桃色bt| 日韩中文字幕无码| 97在线精品视频| 国产成人AV大片大片在线| 国产二三四区| 激情国产av| 天堂av网站| 91天堂最新在线观看| 国产精品久久毛片av大全日韩| 午夜诱惑视频| 不卡的无码高清的免费| 久久国产精品久久久| 国产精品无码久久久久成人麻豆| 91精品导航| 欧美激情综合| 懂色av无码中文字幕一区二区三区| 秋霞高清视频在线直播| 成全视频在线观看免费高清| 激情熟女网| 最近免费字幕中文大全| 东京热无码免费A片免费下载| 久久久精品动漫| 精品久久久999| 轮换2HD| 亚洲AV无码专区在线播放中文 | 久久偷拍av| 五月天中文字幕在线| 婷婷开心情五月色在线| 三上悠亚无码破解69XXX| 中文无码人妻在线| 亚洲AV综合色一区二区三区| 最好看十大无码AV| 无码丰满人妻| 全黄AV| 青青草a免费线观a| 丁香六月啪啪| 激情中文网| 色成人网站www永久免费观看| 2021半夜好用的网站| 影音先锋少妇| 亚洲福利在线播放| 四虎精品成人永久免费| 91av视频在线观看| 国产在视频线精品视频| 无码丰满人妻| 精品一区二区三区四| 婷婷情色| 国产情侣普通话刺激对白| 欧美成人电影一区二区三区| 天天舔夜夜操| 国产精品国产三级国产AV麻豆 | www.日韩无码| 无码熟妇AV又粗又大| 97精产国品| 中文字幕在线电影观看| 中文字幕精品久久久久人妻| 在线91av| 欧美黄色网| 国产麻豆精品乱码一区| 大香线蕉视频在线观看6| 国产AV无码专区亚洲AV| 亚洲国产精品午夜久久久| 欧美毛片一区二区三区有限公司| 福利社普通区免费视频| 色婷婷综合久久久中文字幕| 日韩一区中文字幕| 亚洲AV人人夜夜澡人人| 99久热这里精品免费| 暖暖视频大全免费 视频| 91露脸熟女四川熟女在线观看 | 中文字幕av第一页| 久久婷婷五月综合色丁香花| 久热这里在线精品| 一本大道综合伊人精品热热| 97视频免费观看| 免费精品国产| 国产97视频在线观看| MD传媒免费进入在线观看| 国产乱人乱偷精品视频a人人澡| 成人xxxx| 亚洲午夜成人电影| 亚洲欧美日韩中文在线制服| 一线免费视频BD高清| 国产精品久久久久久一级毛片| av免费在线不卡| 人妻内射一区| 麻豆传媒网站在线观看| 国产乱子夫妻XX黑人XYX真爽| 六月丁香激情| 欧美日韩一级黄色片| 亚洲Av少妇高潮| 在线无码播放| 国产精品啪| 大地资源二中文在线观看官网最新| 秋霞一级| 国产自产在线| 色综合久久av| 蜜臀av性久久久蜜臀av流畅| 91久久香蕉囯产熟女线看内容| av影音先锋影院男人站| 性饥渴艳妇K8经典色欲| 99精品久久久久久中文字幕| 亚洲一区中文| 色成人免费网站| 国产视频91在线| 99xxxxxx| 极品少妇XXXX精品少妇偷拍| 青春禁区直播在线观看高清免费| 欧美日韩精品中文字幕| 国内精品久久久久久久| 日本少妇3p| 欧美大屁股流白浆xxxx视频| 精品视频久久久久| 91热久久免费频精品99欧美| 国产一区二区三区四区精品AV| 99热这里只有精品免费| 久久丝| 欧美日韩3p| 嫩草乱码一区三区四区| 欧美第二页| 麻豆理论片| 高清不卡无码视频| 婷婷情色| 久久丫精品忘忧草产品特点| 中文字幕无产乱码| 亚洲精品国偷拍自产在线麻豆| jizz国产精品| 国产成人网站在线观看| 久久伊人爱| 国产成人区| AWWW在线天堂BD资源在线| 天美传媒国色天香乱码| 午夜时刻免费实验区观看| 一本一道久久久a久久久精品91| 激情综合图| 伦理在线视频| 先锋色资源| 一区精品二区国产| 国产精品黄色片| 国产精品99久久久久久人四| 亚洲日本欧美日韩高观看| 亚洲区中文字幕在线不卡电影| 美女大片免费视频| 新xfyy男人资源站| 美女二区| 在线免费黄色| 亚洲精品乱码久久久久久9色| 99久久99久久精品免费看蜜桃| 日本熟妇丰满| 操逼视频在线观看免费| 91激情网| 午夜激情久久| 久久机热这里只有精品| 毛片在线网| 有码一区| 69人妻人人澡人人爽人人精品浪潮| 精选国产AV精选一区二区三区| 大地资源影视中文二页 | 国产AV一区二区三区人妻| 忘忧草视频资源在线播放| 国产精品女A片爽爽波多洁衣| 麻豆AV一区二区三区在线观看| 国产精品久久久久影院色老大| 91这里只有精品| 美日韩一区二区三区| 五月丁香激情久久| 久久久久一级| 天天欧美| 三级片在线一区| 人妻中文字幕在线一区中文二区| 激情熟女网| 日本一区免费在线观看| 18禁无码| 亚洲经典一区二区三| 亚洲无码一区二区三区电影| 欧美一区二区三区性爱| 无码高清网站| 中文字幕日韩在线观看| 露脸内射| 五十丰满熟妇性旺盛| 国产精品乱| 亚洲欧洲综合在线| 在线亚洲一区二区| 欧美激情久久久久久| 人妻人人干| a毛片网站| 日韩激情视频在线| 天天夜夜久久| 欧美又大又粗又长| 91国在线啪| 久久久久久久久久久久国产精品| 男人天堂视频在线| 欧美三级全黄做爰大尺| 福利片一区| 国产又大又硬又粗| 制服丝袜一区| 少妇在线| 欧美色图亚洲色| 一区二区无码精品| 天天射天天操天天日| 亚洲国产av网站| 成人免费在线观看av| 亚洲黄色电影网| 77777色| 精品国产综合| 久久天天干| 91手机看片| 人人妻人人澡人人爽人人精品| 日本欧美在线播放| 美丽人妻在夫前被黑人| 一二三四中文字幕| 两人做人爱图片大全视频| 最近中文字幕免费手机版| 麻豆啊传媒app官网下载免费| 美女大片免费视频| 最近中文字幕视频在线MV| 夏家三千金 电视剧| 中文字幕日本六区小电影| 男人女人做爰图片| 欧美黄色图片| 欧美乱码视频| 黑人中文字幕一区二区三区| 欧美日韩黄色网| 亚洲永久精品视频| 久久伊人草| 人妻少妇的欲望| 少妇人妻精品视频| 天堂欧美| 国产精品一区二区三区不卡| 日韩一区二区无码| 国产欧洲亚洲| 99视频精品全部免费 在线| 青春禁区视频播放在线观看 | 轻轻色| 操逼| 人人妻人人妻人人妻| 国产91xxx| 影视一区二区三区| 成全视频观看免费高清第6季| 熟妇人妻中文字幕| 精品人妻一区| 欧美1区2区3区4区| 疯狂迎合进入强壮公的视频| 97SE亚洲精品一区| 琪琪午夜伦伦电影理论片A片| 精品人妻无码一区二区三区4| 天天操夜夜操视频| 亚洲色www| 色老大| 国产99精品视频| 亚洲一级AV无码| 国产日韩一区二区| 暖暖 免费 高清 中文视频在线观看| 色五月情| 亚洲精品一区无码A片| 日本孕交| 国产精品人人操| 欧美69久成人做爰视频| 麻豆网站视频| 亚洲激情人妻| 91麻豆视频| 久在线观看福利视频| 大地资源二中文在线播放免费 | 人操人人| 国产成人艳妇aa视频在线| AV一区三区| 久久精品欧美一区二区三区不卡| 老太婆WINDOWSVPS| 伊人22综合网图片| 黄色www网站| 亚洲精品成人影视| 国产精品91久久| 国产午夜无码视频在线观看| 韩日在线| 野花视频免费观看2019| 亚洲综合丁香婷婷六月香| 日本丰满少妇一区二区三区| 91色色网站| 日本精品一二三区| 亚洲视频91| 国产成人综合欧美精品久久| 免费日韩无人区码卡二卡3卡| 97色伦久久视频在观看| 亚洲中文字幕久久无码一区| 高清国产一区二区三区四区五区| www啪啪啪| 亚洲激情五月天| 中文字幕2018年最新中字版 | 非洲一级片| 成人精品一区二区三区电影| 丰满少妇av| 欧美性猛交XXXX乱大交3| 一区三区不卡高清影视| 夜夜操狠狠干| 中国久久| 久久精品国产无码| 一区二区日本视频| 日本亚洲欧洲另类图片| 五月婷婷开心中文字幕| www.啪啪啪.com| 三上悠亚中文字幕在线| 精品国产99久久久久久| mdapptv麻豆入口| 亚洲精品国偷拍自产在线| 国产精品伦理一区| 成人免费视频国产免费天涯| 欧美一区二区高清| 大地资源中文第二页日本| 国产色情综合五色丁香小说| 久久国产精品影院| 久久精品成人热国产成| 人妻精品久久久久中文字幕69| 国产女人高潮视频| 中文字幕在线电影观看| 九百九十九朵玫瑰歌曲原唱| 东北妇女野外BBWBBW免费看| 久热精品在线观看| 热久久免费视频精品38| 97狠狠擼97狠狠擼视频| 成人毛片18女人毛片免费| 久久亚洲精品小早川怜子| 久久中文视频| 日韩欧美高清一区| 两性色黄视频在线观看| 黄色美女网站| 亚洲精久久| 久久国产v一级毛多内射| 国产成人精品综合在线观看| 国产AV亚洲国产AV麻豆| 久久久久com| 少妇真实被内射视频三四区| 欧美无人区码卡二卡3卡| 2017最新中文字幕在| 免费国偷拍精品视频| 成人网站国产| 玖玖精品| 香蕉在线手观看视频| 日本污污视频| 色噜噜色综合| 香蕉国产| www.丁香.com| 国产1区2区3区中文字幕| 国产精品美女久久久免费| 国产精品国产三级国产AV麻豆| 天堂草原影院电视剧| 亚洲黄色电影网站| 人妻无码久久久| 北岛玲手机在线观看视频观看| 亚洲精品久久久久久偷窥| 99爱视频| 曰韩免费视频| 麻豆MD传媒MD0049入口| 懂色av中文一区二区三区天大师| 精品国产乱码久久久久久口爆| 欧美久| 啦啦啦在线直播免费观看下载 | 丁香wu| 国产亚洲久一区二区| 中文字幕淫乱| 日韩中文字幕国产| 亚洲高清中文字幕免费| 亚洲一区二区三区久久久| 天堂成人在线| 人妻无码AV中文系列免费| 日日操视频| 人人艹人人爱| 国产AV国片精品| 亚洲A片一区日韩精品无码| 国产女教师一级爽A| 国产精品久久久久蜜臀| 国产亲妺妺乱的性视频| 国产精品成人一区二区三区电影毛片| 午夜精品99| 久久久久| 欧美国产日产一区二区| 国产三级黄片| 精品无码一区二区三区| 精品AV综合导航| 亚洲色久悠悠| 天堂男人在线| 和少妇人妻邻居做爰无码 | 天天操夜夜操天天操夜夜春宵| 国产美女在线观看| 四房五月色播网| 鲁丝一区| 久久久天堂国产精品女人| 久久日本无码一区二区三区| 人妻在线不卡| 日韩亚洲欧美一区二区 | 日本无码免费A片无码视频美人J| 轻轻色| 亚洲熟妇女|